Lift Requirement Comparision (Lift Pit Depth)

Following the comparision between all lift manufacturer that need to be taken into account before designing the lift system (Vertical transportation services/ installation)

1. Motor Roomless Lift

a. Schindler
> 1.0m/s - overhead 4400mm, Lift pit 1650mm
> 1.5m/s - overhead 4400mm, Lift pit 1650mm
> 1.75m/s - overhead 4400mm, Lift pit 1650mm

b. KONE
> 1.0m/s - overhead 3750mm, Lift pit 1400mm
> 1.5m/s - overhead 3850mm, Lift pit 1450mm
> 1.75m/s - overhead 3850mm, Lift pit 1450mm

c. Royden (Mitshubishi Lift)
> 1.0m/s - overhead 4100mm, Lift pit 1550mm
> 1.5m/s - overhead 4250mm, Lift pit 1650mm
> 1.75m/s - overhead 4350mm, Lift pit 1700mm

d. MS Elevator (Toshiba)
> 1.0m/s - overhead 4500mm, Lift pit 1700mm
> 1.5m/s - overhead 4500mm, Lift pit 1700mm
> 1.75m/s - overhead 4500mm, Lift pit 1700mm

e. Pernas OTIS
> 1.0m/s - overhead 3820mm, Lift pit 1300mm
> 1.5m/s - overhead 3950mm, Lift pit 1350mm
> 1.75m/s - overhead 4000mm, Lift pit 1400mm

2. Motor Room Lift


-to be continue